Detailed explanation of 10KV high voltage transformer

  • By Tianjin Kechang International Trade Co., Ltd
  • Nov 04, 2025

The 10KV high-voltage power grid adopts a three-phase three-wire neutral point ungrounded system operation mode.

Most user transformers use the neutral point direct grounding system operation mode of Yyn0 junction mode for power supply, which can realize three-phase four-wire or five-wire power supply, such as TN-S system. The primary and secondary side coils of an ordinary transformer are placed concentrically on a core column, with a low-voltage winding inside and a high-voltage winding outside. ( The primary and secondary side coils of the transformer of the electric welding machine are mounted on two iron core columns respectively). When the transformer is running with load, when the secondary side current increases, the transformer must maintain the main magnetic flux in the core unchanged, and the primary side current must also increase accordingly to achieve the balanced secondary side current.

Secondary active function of transformer = rated capacity of transformer (KVA) X0.8 (power factor of transformer) = KW

High-pressure end

Example: 100KVAX0.8=80KW. Generally, transformers have no-load voltage regulation and need to be powered off: constant division I, II, III three gears +5%, 0%, -5% L3 L2 L1 N (one time is 10.5KV, 10KV, 0.95KV) and the second time is 380V, 400V, 420V). When exiting), it is generally placed in II gear.

1. Transformer primary current = S/(1.732*10)' secondary current = S/(1.732*0.4).

2. Transformer primary fuse selection = 1.5~2 times the primary rated current of the transformer (transformer above 100KVA).

3. Transformer secondary switch selection = transformer secondary rated current.

4. In addition to installing gas relays and protection lines for transformers of 800KVA and above, the system circuit should also be equipped with appropriate overcurrent and quick-break protection, fixed value setting and regular verification.

Rated capacity: Transformer under rated operating conditions, guaranteed value of transformer output capacity. That is: S=1.73 XULILX10-3 (KkVA) where: UL transformer low voltage side line voltage (V):

Transformer low voltage siding current (A); grounding of power transformer

1. The shell of the transformer should be reliably grounded, the working neutral line and the neutral point grounding line should be laid separately, and the working neutral line cannot be buried underground.

2. The neutral point grounding circuit of the transformer should be made into detachable connecting bolts near the transformer.

3. The grounding of a transformer equipped with a valve arrester should meet the requirements of trinity, that is, the neutral point of the transformer, the transformer shell, and the arrester

The grounding shall be connected at one common ground.

4. The grounding resistance should be ≤4 ohms.

The safe distance of 1-10kV high-voltage lines is 6 meters; the safe distance of 154-220kV high-voltage lines is 10 meters; the safe distance of 35-110kV high-voltage lines is 8 meters; the safe distance of 350-500kV high-voltage lines is 15 meters.

10KV high-voltage power transformer.jpg

Recent News

Detailed explanation of 10KV high voltage transforme...
November 4, 2025
Innovation driven, patent escorts
October 27, 2025
Leading the energy efficiency revolution with innova...
October 21, 2025
Leading the new era of intelligent power distributio...
October 17, 2025
Three ways of insulation of ring main unit
September 24, 2025
What is the quality of Tianjin Kechang International...
September 5, 2025
Embarking on a New Journey with China Schneider Elec...
August 26, 2025
China High tech Electrical Equipment Company: Kechan...
August 18, 2025
Can power equipment and medium to high voltage trans...
August 12, 2025
Oil-immersed transformers: the mainstay of stable po...
April 7, 2025
  • Any Questions? Call us

    (+86) 18102132997

  • Any Questions? Email us

    eden@kechangelectric.com

Contact Info

  • 12FL, C Zone, Junlong Plaza, No.99 Nanjing Road, Heping District, Tianjin, People's Republic of China
  • (+86) 15302071298 (Whatsapp/Wechat)
  • mia@kechangelectric.com
  • VK

Services

  • Home
  • About Us
  • Products
  • News
  • Send inquiry

Latest News

  • Detailed explanation of 10KV high voltage transformer
    Detailed explanation of 10KV high voltage transformer 04 Nov, 2025
  • Innovation driven, patent escorts
    Innovation driven, patent escorts 27 Oct, 2025
  • Leading the energy efficiency revolution with innovative technologies
    Leading the energy efficiency revolution with innovative tec... 21 Oct, 2025
  • Leading the new era of intelligent power distribution with innovative technology
    Leading the new era of intelligent power distribution with i... 17 Oct, 2025
  • Three ways of insulation of ring main unit
    Three ways of insulation of ring main unit 24 Sep, 2025
  • What is the quality of Tianjin Kechang International Trading Company's products?
    What is the quality of Tianjin Kechang International Trading... 05 Sep, 2025
  • Embarking on a New Journey with China Schneider Electric
    Embarking on a New Journey with China Schneider Electric 26 Aug, 2025
  • China High tech Electrical Equipment Company: Kechang Electric Co., Ltd
    China High tech Electrical Equipment Company: Kechang Electr... 18 Aug, 2025
  • Can power equipment and medium to high voltage transformer partners choose KeChang?
    Can power equipment and medium to high voltage transformer p... 12 Aug, 2025
  • Oil-immersed transformers: the mainstay of stable power system operation
    Oil-immersed transformers: the mainstay of stable power syst... 07 Apr, 2025

Contact Form

© Copyright 2007 Tianjin Kechang electric Technology.